 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
|
|
|
New System, Click Logo:
|
|
 |
|
|
 |
|
|
|
|
|
|
|
|
Photos: Cold and hot water conditioning in Padborg Chicken Slaughter House
|
|
|
|
|
|
|
|
|
 |
|
 |
|
|
|
|
|
|
|
|
Left: Two 1 1/4" units, capacity 7800 litre/h installed on the cold water supply inlet and the warm water circulation. Right: Chief Engineer Poul Connesen at the 1 1/2" unit, 12000 litre/h. conditioner capacity installed on the hot water boiler supply for the chicken slaughter production line.
|
|
|
|
|
|
|
|
|
|
The problem: Production stoppages, expensive service and repair caused by lime scale deposits in the hot and cold water system as well as the cooling towers. Avoiding the use of aggressive chemical acids and environmental pollution. The solution: Cooling tower: 1" conditioner on the make-up water supply. Production Treatment with two 1 1/4" units, 7800 litre/h capacity on each cold water supply inlet and on hot water circulation. Conditioning of hot water boiler circulation for production line with a 1 1/2" unit: Capacity: 12,000 litre/h. The results: Within the first 3 months solid disposals were dissolved and removed form the cooling tower, without use of chemicals! Substantial amounts of scale and rust were dissolved in the cold and hot water pipeline system. Some filters had to be cleaned manually. Today the system is clean and has proved a constant optimal operation function.
|
|
|
|
|
|
|
|
|
|
ADDITIONAL TREATMENT ADVANTAGES AND RESULTS
Previous pressure loss and possibilities for bacterial growth on lime scale formations prevented, better heat transfer, less maintenance as well as less chemicals dosage for the cleaning procedure due to a 10% reduced water surface tension.
No pressure loss, power consumption, chemicals, or service required!
The perfect non chemical treatment to avoid lime scale and corrosion in water systems
|
|
|
|
|
|
|
|
|
 |
|
 |
|
 |
|
 |
|
|
|
|
|
|
|